Motus Walk 2 Work Gangway

The MOTUS Walk 2 Work gangway (MWW) is based on our long experience with marine and offshore cranes and is designed to be placed on a vessel for safe transfer of personnel to/from windmills or other installations.

The MWW’s is developed based on two different access technologies to allow/secure safely landing and safely crew transfer.

• Passive transfer gangways, which are first connected to the offshore installation and then put in free-flow mode when it is connected.
• Active transfer gangways which has motion compensation during landing and lift- off. The gangway is put in free-flow mode when it is connected.
 
Tailor made solution in close cooperation with clients will be delivered upon request. 

Typical Technical Information of MOTUS Walk 2 Work Gangway 

 
Product 
MAX Length (m) 
Operating length (m) 
Operating angle up/down * 
Walkway width (m) 
MWW 12 
12 
± 3
+22 / -20 
0,8
MWW 20 
20 
16 ± 4
+20 / -15 
1,2
MWW 30 
30 
25 ± 5
+15 / -15 
1,2
MWW 40 
40 
34 ± 6
+15 / -15 
1,2
MWW 50 
50 
43 ± 7
+15 / -15 
2,0
Workability: Sea states 2,5m Hs to 3,5m Hs *
* Subject to vessel length & heading and location of the system on the vessel 

Features / Benefits

• Certified according to:
• DNVGL-ST-0358
• DNV 2.22
• Motion compensation
• Robust design
• Operation temp -20 to +45°C
• Seawater resistant aluminum construction
• Anti-collision system (boom tip)
• Self-contained 

Options

• Design according BV NR526
• Certification according BV NI629
• Telescopic pedestal
• Emergency operation
• Manual Load Handling (250kg)
• Crane function (on request)
• Extended monitoring
• Camera monitoring
• Wind speed monitoring
• Full motion compensation
• Suitable for Ex-zone 1 or 2